Skip to content
Industries/Oil and Gas

Oil and Gas

Structural skids, welded assemblies, and tubing hangers for oil and gas programs.

Oil and gas work here is production welding first — then assembly, then machining — on structural skids, welded assemblies, flanged pipe weldments, and machined tubing hangers in Fort Worth and DFW. We quote repeating programs, not one-off job-shop work.

Flanged A106 carbon steel pipe weldments with branch ports, fabricated by Kannon Manufacturing

Pipe welding

Flanged A106 carbon steel pipe weldments with branch ports — structural and process-pipe welding proof from the Fort Worth shops, not a pressure-vessel product.

Precision lathe-machined tubing hangers for oil and gas, fabricated by Kannon Manufacturing

Tubing hangers

Lathe-machined tubing hangers for oil and gas — CNC proof that feeds the same repeating programs as the structural and skid weldments.

Tubing Hangers — machined tubing hangers production run for oil and gas, fabricated by Kannon Manufacturing

Tubing Hangers

Tubing Hangers production run — repeating machined details for oil and gas programs, staged as shop-floor proof.

Structural and skid fabrication for oil and gas

Oil and gas fabrication at Kannon is structural steel work: production welding, then assembly, then the machining that locates the weldment. Skid-mounted systems, welded structures, and flanged A106 pipe weldments run on the same Fort Worth floor. The shop quotes structural, skid, and machined-component programs — not ASME pressure-vessel work. Buyers see weld qualifications, bay and robot counts, and inspection before a plant visit — the same evidence used to qualify a repeating manufacturing partner.

Tubing hangers and machined details

RFQs we can run look like structural skids, welded assemblies, flanged pipe weldments, and machined tubing hangers — cut, formed, welded, and machined in-house. Shop-floor proof for this market is the pipe-welding photo and the tubing-hanger photos on this page and on the work gallery. Those builds are structural welding and CNC evidence. The shop does not quote pressure-vessel work.

Repeating oil and gas programs in Fort Worth

Oil and gas manufacturing here is partnership work, not a one-off job shop. The first skid, pipe weldment, or tubing-hanger run sets the fixture, weld, and inspection sequence so the next units run the same way for Dallas–Fort Worth and field releases. Fort Worth capacity is 30 manual MIG/TIG bays and 3 OTC welding robots (including a 16 ft slider). Send drawings, materials, volume, and timing when you are ready to qualify the shop.

What to send in an oil and gas RFQ

Drawings or a model, material and weld spec, annual or release volume, and the date the first units have to ship. Call out fixture or inspection requirements if they are already set. Structural steel programs are quoted against AWS D1.1, D1.3, 80K, and 100K where those apply. If the package is an ASME pressure vessel, say so up front — that is not the work this floor quotes. We will tell you if the work fits.

What oil and gas RFQs scrutinize

Qualifying a long-term manufacturing partner before a structural or skid program is awarded

Weld quality on structural steel, skids, and flanged pipe weldments that have to repeat

Machined details such as tubing hangers that have to land with the fabricated structure

Welding, assembly, and machining coordinated without extra vendors

How Kannon runs oil and gas production

Welding-first oil and gas fabrication: 30 manual MIG/TIG bays and 3 OTC welding robots (including a 16 ft slider)

AWS D1.1, D1.3, 80K, and 100K weld qualifications for structural steel

In-house assembly and CNC for skids, flanged pipe weldments, and tubing hangers

The first unit sets the fixture, weld, and inspection sequence so the next run matches

Project examples

Anonymous summaries of jobs the shop has run.

Customer names are omitted by request. Each entry lists what came in, what we ran, and how it shipped.

Oil and gas program (Texas) project
Oil & Gas

Oil and gas program (Texas)

Challenge

Structural skids, welded assemblies, and machined tubing hangers for a repeating field program.

Solution

Cutting, forming, welding, assembly, and inspection ran in-house under one team — structural and skid work, not ASME pressure vessels.

Result

Fit-up consistency and on-time delivery on the next deployment cycle.

CuttingFormingRobotic and Manual WeldingIndustrial Fabrication

Quote an oil and gas program

Send drawings, materials, annual volume, and timing. Someone from Kannon will follow up directly.