
Robotic and Manual Welding
3 OTC welding robots (including a 16 ft slider) and 30 manual MIG/TIG bays, with AWS D1.1, D1.3, 80K, and 100K qualifications for structural and skid work.
DetailsCapabilities
Machine counts, work envelopes, materials, and weld qualifications for welding, assembly, machining, and the fabrication processes behind them. Laser, brake, tube, and inspection support the build.

3 OTC welding robots (including a 16 ft slider) and 30 manual MIG/TIG bays, with AWS D1.1, D1.3, 80K, and 100K qualifications for structural and skid work.
Details
In-house fit-up and turnkey weldment assembly for repeating programs — skids, frames, and container-scale builds, including an immersion-cooled bitcoin miner.
Details
Cutting, machining, forming, welding, tube bending, rolling, assembly, and inspection across two Fort Worth buildings, including an immersion-cooled bitcoin miner.
Details
Precision turning and milling across 10 CNC lathes, 11 CNC mills, and manual machining support.
Details
Amada laser, saw, and shear capability for sheet, plate, tube, and expanded metal inputs.
Details
Press brake forming and plate/sheet rolling with Accurpress and Safan equipment up to 250 tons.
Details
Amada laser cutting and press-brake forming for sheet and plate that feed welding and assembly programs.
Details
Manual tube bending with dies for square, round, and rectangular tube requirements.
Details
Kannon coordinates powder coating, paint, and e-coating through outside finishing partners, so customers get finished parts with one point of contact.
DetailsEquipment and facilities
Cutting, machining, forming, welding, tube bending, rolling, assembly, and inspection run across two Fort Worth locations.
View quality and certificationsCNC Lathes
10 machines: 4 Mori Seiki, 3 Okuma, 1 Feeler, 1 Doosan with live tooling, 1 Hwacheon
Lathe capacity
Up to 15.3 in. OD and 49 in. turning length, with a 12 in. chuck
Amada lasers
2 machines: 9 kW and 3 kW
Saws
3 Hyd-Mech saws
Press brakes
4 Accurpress / Safan machines
Brake capacity
Up to 250 tons
Robotic welding
3 OTC welding robots (including a 16 ft slider); 6 ft. x 10 ft. x 12 ft. welding area
Slider robotic cell
16 ft slider on one of the three welding robots
Welding and fit-up
30 manual MIG/TIG bays and 3 OTC welding robots (including a 16 ft slider)
Weld qualifications
AWS D1.1, D1.3, 80K material, 100K material, additional upon request
Short runs are fine when they fit the floor. The capabilities above support long-term, annual-volume welding, assembly, and machining partnerships.
Skids, enclosures, frames, and container-scale builds on repeating data center manufacturing programs.
View data centersWeldments, frames, and tanks for repeating heavy equipment OEM production.
View heavy equipmentStructural weldments, pedestals, and boom assemblies for repeating boom truck OEM programs.
View boom trucksKannon is a manufacturing partner that specializes in welding, assembly and machining with full fabrication capabilities. Welding is first, then assembly, then machining. The work is long-term repeating programs, not one-off job-shop traffic.
Our primary shop is at 5129 Vesta Farley Rd, Fort Worth, TX 76119. Welding, assembly, and machining run across two Fort Worth locations totaling more than 100,000 square feet. Call 817-563-1251.
The shop holds AWS D1.1, AWS D1.3, 80K, and 100K material weld qualifications. Additional weld certifications are available upon request.
Kannon builds for heavy equipment manufacturing, boom trucks, aerial lift platforms, trailers, oil and gas, data centers, power engines, and warehouse automation. Programs run from two Fort Worth shops.
Kannon operates a thorough, ISO-compliant quality system built around drawing review, in-process and final inspection, traceability, and AWS D1.1, D1.3, 80K, and 100K weld qualifications. We can share our quality documentation for your program.
Kannon coordinates powder coating, paint, and e-coating through outside finishing partners, so customers get finished parts with one point of contact.
Drawings, materials, quantities or annual volume, weld certifications if any, and the date you need parts. A sketch or photo works if that is what you have.
Short runs are fine when they fit the floor. The work we want is repeating programs — long-term, annual-volume welding, assembly, and machining partnerships, not one-off job-shop traffic.
The same weldments, assemblies, or machined parts running year over year with one project owner — from the first unit through the annual volume. Welding is first, then assembly, then machining. That is the partnership we build toward.
Yes. Cutting, machining, forming, welding, tube bending, rolling, inspection, and assembly run in-house across two Fort Worth buildings.
Short runs are fine when they fit the floor. Send drawings, materials, annual volume, weld qualifications, and timing for a long-term welding, assembly, and machining partnership.